Engineering

Artificial Turf Field Design Anne Arundel County, MD
Anne Arundel County decided to upgrade the stadium fields at 11 High Schools to an artificial turf surface. This phased program began in the fall of 2007. AmDyne was contracted to prepare the Request for Proposal, conduct elevation surveys, geotechnical investigation, detailed design, submittal review and provide on-site construction inspection. AmDyne completed all phases of design and construction inspection of the high school fields including site planning, specification development, RFP development, detailed design, submittal review and construction administration.
Secondary Containment Design and Installation Andrews Air Force Base, MD
AmDyne designed and installed secondary containment tanks and ancillary equipment (piping, valves, trench drains) at three (3) gas stations and five (5) other fueling areas such as emergency diesel generators and intermediate fueling locations. The 3 gas stations received surge tanks. These tanks ranged in size from 4,000 gallons to 10,000 gallons. These systems were installed at the Andrews AFB gas stations to capture fuel spilled as a result of any mishap in vehicle fueling operations. AmDyne was responsible for the design and construction of these tank systems including scheduling, procuring specialized, long-lead time items, on-base coordination and logistics, as well as managing on-site construction and installation of these systems.
Machine Shop Facility Design
AmDyne completed all phases of design and construction management of this facility including site planning, structural design, MEP design, machinery layout and submittal reviews for the 50 ft x 140 ft Machine Shop addition. This 7,000 square foot high-bay metal structure was designed to match the existing exterior in height and materials and incorporated a 5-ton bridge crane, fire protection, utility support to machining equipment, mechanical and tool storage rooms.
Design Services for Backflow Prevention Anne Arundel County, MD
AmDyne provided engineering design services for new back flow prevention to the existing fire sprinkler systems at the County’s Riva Road complex. Additionally, reduced pressure backflow preventers on boilers and cooling tower water lines were installed at the Arundel Center. At 3 Harry S. Truman Parkway, AmDyne installed reduced pressure backflow preventers on the boiler’s make up water lines.
AmDyne provided schematic design and construction documents for all three projects. During construction, AmDyne personnel were available for site visits, pre construction meetings, progress meetings and the conditional acceptance meetings.
Downs Park Pavilion Anne Arundel County, MD
AmDyne examined the pavilion at Downs Park and provided design services for its renovation and upgrading. Our examination included Site soils investigation to determine footing type, Schematic Design and Construction Drawings and Specifications, Bid Set Drawings and Specifications, Bid Phase/Award Support and Letter of Recommendation for Award.
Parker Creek View, Spillway Barrel Rehabilitation Anne Arundel County, MD
AmDyne Corporation is provided design for the Parker Creek View, Spillway Barrel slip line rehabilitation. Our work included the following tasks; Site investigation and Survey, Engineering and applicable permit applications, Bid Set Drawings and Specifications, Bid Phase/Award Support and Letter of Recommendation for Award, Construction Inspection and As-Built drawings preparation.
DPW Facility Compliance Phase III Anne Arundel County, MD
AmDyne is providing construction management and field inspection, survey work and other necessary services for the leaf drying pits at county transfer stations.
Administrative Building & Greenhouse New Construction Ft. Detrick, MD
AmDyne Corporation is subcontractor to ARGO Systems LLC, on the design/build construction of a 7,500 square foot Administration Building on Ft. Detrick, Maryland. AmDyne conducted the site design and survey for the building. Design drawings were developed and approved. AmDyne provided on-site inspection for proper compaction and elevation. AmDyne is responsible for the construction management and the quality assurance management of the project. We prepared the quality assurance plans, developed the schedule, prepared contract modifications and change orders, and tracked all project costs. We conducted daily on-site inspection to insure the activities were conducted in accordance with QA plan and also monitored construction safety.
Building 9 Addition NSWC Carderock Division West Bethesda, Maryland
AmDyne prepared the detailed design, provided onsite construction management and completed product and equipment submittal reviews for a 50 ft x 140 ft Machine Shop at the Naval Surface Warfare Center, Carderock Division. Initial Site work included drawings, specifications and application for the Maryland Department of Environment Stormwater Management and Erosion and Sediment Control Permits. This 7,000 square foot high-bay metal structure incorporated a 5-ton bridge crane, fire protection, utility support to machining equipment, mechanical and tool storage rooms. Included in the project is a grinding room with isolated ventilation system. This new addition was designed to match the existing exterior in height and materials. AmDyne completed all phases of design and construction management of this facility including: Site Planning, Structural Design, and Mechanical and Electrical Design:
E-85 Design and Installation Fort Belvoir, VA
Building 1124 Fuel Depot contains an empty 12000 gallon underground storage tank that was installed in November 1986, and is constructed of double-walled steel with corrosion-resistant exterior coating that the government wishes to reuse as an E-85 storage and dispensing vessel. The vessel was tested and certified by the government as clean, tight, and available for re-use. Design phase services included a site and utility survey and civil engineering design for the conversion including brining the site and accessories into compliance with the current specification requirements. AmDyne also provided test pit verifications and Veeder Root conductivity evaluations.